Hello, welcome to the official website of Co-nele Group Co., Ltd.!

Concrete pump

News

Product

Contact

Enterprise: Qingdao Co-nele Group Co., Ltd.

Address: Yuhuangling Industrial Park, Chengyang District, Qingdao City

Sales hotline: 0532-87876387

Company Fax: 0532-89651313

Service hotline: 400-6362101

Domestic sales hotline: 0532-87876387 13608980651

International sales hotline: 086-532-89651307

Website: www.conelejt.com

Website:en.conelejt.com

Is there any hard regulation for analyzing the safety device of the on-board pump?

Your current location: Home >> News >> company news

Is there any hard regulation for analyzing the safety device of the on-board pump?

Release time:2019-01-24 Author: Click:

The on-board pump has been widely used in various construction parties, because it can greatly improve the efficiency of concrete transportation, so it is welcomed by the majority of construction parties. So how should the on-board pump be poured concrete during the construction process?

Is there any hard regulation for analyzing the safety device of the on-board pump?

In fact, in the construction, many construction parties want to buy a safe and reliable on-board pump, so what kind of on-board pump is safe and reliable? In general, the on-board pump needs to comply with the inspection requirements of the following safety devices during the installation process. Specifically, there are the following points:

1.The hydraulic system should be equipped with safety devices to prevent overload and hydraulic shock. The regulating pressure of the safety valve should not exceed 110% of the rated working pressure of the system. The rated working pressure of the system should not be greater than the rated pressure of the hydraulic pump.

2.The brake of the on-board pump should be sensitive, reliable, effective and non-deviating. The stamping and traction should meet the requirements of vehicle detection. The free travel of the brake pedal should meet the manual requirements.

3.The on-board pump alarm and emergency brake switch should work reliably.

4.The platform plate and protective railing of the vehicle pumping station should be intact. Safety warning signs and related operational signs should be complete and eye-catching. The operating room should be equipped with fire extinguishing equipment.


Welcome to leave us a message.
Please enter the message here and we will contact you as soon as possible.
Name
Name
Tel
Tel
Email
Email
Add
Add